Loading
Loading

HUB Application
Coloured bike lane systems that hold visibility and protect cyclists season after season.
Designing for Bike Lanes?
Product matching, technical data, and certified installer support across Canada.
A faded bike lane is a dangerous bike lane. When the green disappears, so does the driver's understanding that this space belongs to someone else. HUB bike lane systems are engineered to stay visible — StreetBond UV-stable acrylic maintains vivid green, red, and custom Pantone colour through years of traffic and weather without chalking or fading. MMAX methyl methacrylate is specified where overnight curing is required in transit-adjacent corridors — full cure in 30-60 minutes, bond strength exceeding 3 MPa. PreMark preformed thermoplastic symbols and edge lines provide retroreflective bicycle pictographs, arrows, and conflict zone markings that hold their geometry and visibility through seasons of heavy use. The complete specification for protected bike lanes, intersection treatments, and multi-use path markings that need to perform as long as the infrastructure itself.
38 photos

Bike Lanes · Overview

Bike Lanes · Installation

Bike Lanes · Detail

Bike Lanes · Completed

Bike Lanes · In Service

Bike Lanes · Close-up

Bike Lanes · Overview
Showing 7 of 38

StreetBond
Coloured coatings for Canadian applications. Bold. Tough. Engineered for Canada.

MMAX
MMA resin coating. 45–60 min cure. Engineered for transit lanes and bike priority corridors.

PreMark
Preformed thermoplastic symbols and legends. Drive-on installation.

TrafficPatterns
Custom preformed thermoplastic crosswalk and surface marking. Factory-manufactured at 125mil, heat-fused permanently to asphalt or concrete.

TrafficPatternsXD
Stamped asphalt with aggregate-reinforced preformed thermoplastic.
Education & Engagement
Lunch included, in your office or virtual.

