Ghost button text
This project has 179 spaces, along with priority stalls and electric car parking, all using colour to delineate the space.

The material is holding up to the snow clearing army and is providing the colour and non-slip surface that StreetBond provides. Installed by Thermo-Design Inc. in the Montreal region this project took approximately 5 days to layout and install.

previous arrow
next arrow
Slider

Everyone says…. “it looks great, but this Canada.  Will it last?”  Well, Montreal’s latest indoor soccer facility that was built to LEED standards, and is a great example of StreetBond performing.